.

Saturday, June 22, 2019

Case project analysis Assignment Example | Topics and Well Written Essays - 2500 words - 1

Case toil analysis - Assignment ExampleThere were used two different forge delivery methods instauration -build system for Springfield Interchange Improvement Project (SIIP) and design-bid-build system for the Guri dam up Project. For both projects there were used scope statements as tools of project planning process. However, the limit of the project scope statements varied substantially and depended on the number of details and relevant elements related to the project. Implementation stage of both projects was controlled and monitored. However, in contrast to SIIP project, the Guri Dam project was closely monitored by the Edelca Company. For the Guri Dam project there were introduced severe economical penalties for breach of the project/contract terms. Based on the review and analysis of the project management practices, applied in the SIIP and the Guri Dam projects, it is possible to state that the Guri Dam Project performed better than the SIIP project across all four pract ices project selection, project delivery system, project planning, and project control.Springfield Interchange Improvement Project is a case study of one of the transportation megaprojects. It is a project of the interchange reconstruction, situated in fifteen miles south of Washington, D.C. on the intersection of the Capital Beltway and Highways 1-95 and 1-395. The project was mainly initiated because of the safety risks and danger imposed to all way users, especially motorists (Kwak et al., 2002). Reconstruction of this Interchange had vital importance to a variety of stakeholders, including local entrepreneurs and businessmen, commercial carriers, and local residents. The Virginia Department of Transportation (VDOT) began project management hold on this project. The project has been divided into 8 key stages. While the general scope of the project was defined in a right way, there were close to obvious problems with cost estimate calculation of the project. Thus, for example, the cost estimate was $US 220

No comments:

Post a Comment